KYTC schedules mowing on New Circle Road inner loop Monday
Aug 28, 2026
LEXINGTON, Ky. — The Kentucky Transportation Cabinet will conduct routine mowing operations on New Circle Road during a two-hour window Monday, according to a KYTC press release. The work is scheduled for Aug. 31 between 10 a.m. and noon on the inner loop of KY 4 along the cable barrier.
Operatio
ns will span from mile point 4.6 at Versailles Road to mile point 14.8 at Richmond Road. The mowing will take place as a mobile operation in the fast lane, and motorists are advised to exercise caution and watch for crews working in the area. According to the KYTC, mowing operations do not typically cause lane closures, though traffic may be slowed.
The work is part of routine maintenance conducted by KYTC District 7, which oversees 12 central Kentucky counties. The schedule remains tentative and subject to change due to weather conditions or unforeseen circumstances. Motorists can find additional information on the cabinet’s website or by contacting the local KYTC office. All work and closures are contingent on weather and other factors beyond the department’s control.
Sources
KYTC District 7 Press Releases
KYTC announcement on mowing operations and traffic impacts
This article was generated by AI (claude-haiku-4-5-20251001) based on source material from KYTC District 7 Press Releases, enriched with 2 web searches. The original source is available at https://content.govdelivery.com/accounts/KYTC/bulletins/4274403.
View in feeds
The post KYTC schedules mowing on New Circle Road inner loop Monday appeared first on The Lexington Times.
...read more
read less