TxDOT road closures for the week of Jan. 17, 2025
Jan 17, 2025
EL PASO, Texas (KTSM) – The Texas Department of Transportation (TxDOT) El Paso has released a list of road closures for the week of Jan. 17, that could affect your commute.
I-10 Widening West
Monday, Jan. 20, through Saturday, Jan. 25 from 9 a.m. to 4 p.m.
I-10 East and West will be alternatingly reduced to one lane between Vinton Road and Transmountain Road.
Crews will be working on retaining walls and conducting earth work.
Monday, Jan. 20, through Saturday, Jan. 25 from 9 a.m. to 4 p.m.
I-10 East and West will be alternatingly reduced to one lane between Mesa Street and Redd Road.
Crews will be conducting earth work and prepping the bridge deck.
Monday, Jan. 20, through Thursday, Jan. 23 from 9 p.m. to 5 a.m.
The onramp from South Desert Boulevard to I-10 East at Artcraft will be closed.
DETOUR: Continue on South Desert, re-enter I-10 East past Mesa Street.
Crews will be adjusting metal beam guard fence.
24-HOUR CLOSURE
Saturday, Jan. 25 at 4 a.m., through Sunday, Jan. 26 at 4 a.m.
I-10 West will be closed at Mesa Street.
DETOUR: Take Exit 11 (SH 20/Mesa Street/Thorn Avenue), continue on North Desert Boulevard, re-enter I-10 West past Redd Road.
I-10 East will be closed at Redd Road.
DETOUR: Take Exit 9 (Redd Road), continue on South Desert Boulevard, re-enter I-10 East past Mesa Street.
Crews will be installing the bridge deck.
Monday, Jan. 27, through Friday, Jan. 31 from 9 a.m. to 4 p.m.
The offramp from I-10 West at Transmountain Road will be closed.
DETOUR: Take Exit 8 (Artcraft Road) and continue on North Desert to Transmountain Road.
Crews will be working on curb repairs.
ADVANCE NOTICE: 49-HOUR FREEWAY CLOSURE
Saturday, Feb. 1 at 4 a.m., through Monday, Feb. 3 at 5 a.m.
I-10 East will be closed at Redd Road.
DETOUR: Take Exit 9 (Redd Road), continue on South Desert Boulevard, and re-enter I-10 past Mesa Street
Saturday, Feb. 1 from 4 a.m. to 4 p.m.
Redd Road will be closed for 24 hours between North Desert Boulevard and South Desert Boulevard.
EASTBOUND DETOUR: Turn right on South Desert Boulevard, use the turnaround at Mesa Street, continue on North Desert Boulevard, and turn right on Redd Road.
EASTBOUND DETOUR: Turn right on North Desert Boulevard, turn left on Artcraft Road, turn left on South Desert Boulevard, and turn right on Redd Road.
Crews will be installing the bridge deck.
ADVANCE NOTICE: 49-HOUR FREEWAY CLOSURE
Saturday, Feb. 8 at 4 a.m., through Monday, Feb. 10 at 5 a.m.
I-10 West will be closed at Mesa Street.
DETOUR: Take Exit 11 (SH 20/Mesa Street/Thorn Avenue), continue on North Desert and re-enter I-10 past Redd Road.
Saturday, Feb. 8 from 4 a.m. to 4 p.m.
Redd Road will be closed for 24 hours between North Desert Boulevard and South Desert Boulevard.
EASTBOUND DETOUR: Turn right on South Desert Boulevard, use the turnaround at Mesa Street, continue on North Desert Boulevard, and turn right on Redd Road.
EASTBOUND DETOUR: Turn right on North Desert Boulevard, turn left on Artcraft Road, turn left on South Desert Boulevard, and turn right on Redd Road.
Crews will be installing the bridge deck.
I-10 Widening West 2
Monday, Jan. 20 through Saturday, Jan. 25, daily from 9 a.m. to 4 p.m.
Alternating lane closures on I-10 East and I-10 West from Anthony, TX to Nashua Road.
Alternating lane closures on North Desert Boulevard and South Desert Boulevard from Anthony, TX to Nashua Road.
Crews will be performing dirt work and removing miscellaneous materials.
Pedestrian Facilities Improvement Project
Monday, Jan. 20 through Friday, Jan. 24 from 9 a.m. to 4 p.m.
US-62 (Paisano) west- and eastbound between Boone and Val Verde alternating lane closures.
Crews will be working on installation of mast arm, signs and ped poles.
Dyer west- and eastbound between Titanic and Hercules alternating lane closures.
Crews will be working on installation of signs and ped poles.
Dyer west- and eastbound between Ellerthorpe and Julian right lane closed.
Crews will be working on the placement of concrete ramps and the installation of signs and ped poles.
Borderland Expressway Project
Monday, Jan. 20 until further notice, from 7 a.m. to 4 p.m.
North- and southbound Railroad Drive and north- and southbound Dyer Street between project limits alternating lane closures.
Crews will be doing signal and striping work.
Guardrail Repair Project
Tuesday, Jan. 21, daily from 9 a.m. to 4 p.m.
I-10 westbound at Santa Fe complete on-ramp closure.
Wednesday, Jan. 22.
US-54 southbound between Mesquite Hills and McCombs left lane closure.
Thursday, Jan. 23.
Sunland Park eastbound complete on-ramp closure.
Friday, Jan. 24.
I-10 eastbound between Cotton and Piedras right lane closure.
Crews will be working on guardrail.
Maintenance
Tuesday, Jan. 21 through Friday, Jan. 24 from 9 a.m. to 4 p.m.
Loop 375 (Transmountain) east- and westbound between both picnic stations alternate lane closures.
Crews will be installing signs.
US-54 northbound at Kenworthy complete freeway closure.
Detour: Exit at Kenworthy.
Gateway North between Kenworthy and Sean Haggerty left lane closed.
Gateway North between Arlen and Hondo Pass left lane closed.
US-54 North at Hondo Pass exit closed.
Crews will be installing delineators.
Woodrow Bean between Kenworthy and Railroad alternate lane closures.
Loop 375 (Border Highway) underneath overpasses at Padres, Midway, Yarbrough, and Fonseca alternate lane closures.
Crews will be cleaning.
Montana Widening Project
Monday, Jan. 20 to Tuesday, Jan. 21, daily from 9 a.m. to 5 p.m.
Montana Avenue (US 62/180) eastbound frontage road left lane closed between Lee Trevino Drive and East Glen Drive.
Crews will be working on the bus stops.
Wednesday, Jan. 22 to Thursday, Jan. 23, daily from 9 a.m. to 5 p.m.
Montana Avenue (US 62/180) westbound frontage road left two lanes closed between 11701 Montana Avenue (Armed Forces Reserve Center) and George Dieter Drive.
Purple Heart 375 Widening Project
Monday, Jan. 13 to Friday, Jan. 31, daily from 8 a.m. to 4:30 p.m.
Purple Heart Highway (Loop 375) north- and southbound left lane closures between Montana Avenue and Iron Medics Drive.
Crews will be paving in median.
Continuous closure until further notice.
Purple Heart Highway north and southbound shoulder closures from Montana Avenue to Spur 601.
Crews will be widening main lanes and constructing north and southbound frontage road.
Alameda Mill and Inlay Project
Monday, Jan. 20 to Friday, Jan. 24, daily from 9 a.m. to 4 p.m.
Alameda Avenue (SH-20) east- and westbound alternate lane closures between Glenwood Street and Presa Place.
Crews will be installing small road signs and striping.
Horizon/Darrington Reconstruction Project
Monday, Jan. 20 to Friday, Jan. 24, daily from 9 a.m. to 4 p.m.
Pawling Drive will be closed to thru traffic at Darrington Road.
Access to local businesses at 150 Darrington Road to be open via Pawling Drive.
Crews will be installing storm drain system and waterlines and boring electrical lines at the intersection.
Monday, Jan. 20 to Friday, Jan. 24, daily from 9 a.m. to 4 p.m.
Horizon Boulevard (FM1281) east- and westbound intermittent right lane closure at Thea Smith.
Crews will be installing new roadway illumination.
Closure links:
West Area Project Closures
I-10 Widening West Closures
East Area Project Closures