Oct 18, 2024
EL PASO, Texas (KTSM) – The Texas Department of Transportation (TxDOT) El Paso has released a list of road closures for the week of Oct. 18, that could affect your commute. I-10 Widening West Sunday, Oct. 20, and Monday, Oct. 21 from 9 p.m. to 5 a.m. South Desert Boulevard will be reduced to one lane between the Artcraft Road onramp and Redd Road. Crews will be installing concrete pavement. Monday, Oct. 21, through Friday, Oct. 25, and Monday, Oct. 28 from 9 a.m. to 4 p.m. South Desert Boulevard will be reduced to one lane south of Bentridge Drive. Crews will be installing metal beam guard fence. Monday, Oct. 21, and Tuesday, Oct. 22 from 9 p.m. to 5 a.m. I-10 East will be reduced to one lane between Redd Road and Mesa Street. The eastbound Artcraft Road onramp will be closed. DETOUR: Continue on South Desert Boulevard, enter I-10 past Mesa. Crews will be placing concrete pavement. Monday, Oct. 21 through Saturday, Oct. 26 from 9 a.m. to 4 p.m. I-10 East and West will be reduced to one lane between Vinton Road and Transmountain Road as needed. Crews will be working on retaining walls. Monday, Oct. 21, through Saturday, Oct. 26 from 9 a.m. to 4 p.m. I-10 East and West will be reduced to one lane between Mesa Street and Redd Road. Crews will be conducting earth work. Wednesday, Oct. 23 from 9 p.m. to 5 a.m. I-10 East will be reduced to one lane between Los Mochis Drive and Transmountain Road. Crews will be placing concrete pavement. Thursday, Oct. 24 from 9 p.m. to 5 a.m. I-10 West will be reduced to one lane between Transmountain Road and Los Mochis Drive. Crews will be placing concrete pavement. US 62 Rehabilitation Project Monday, Oct. 21 through Tuesday, Oct. 25 from 9 a.m. to 4 p.m. (Daily) If needed mobile lane closure - Paisano / Montana (US-62) westbound and eastbound alternating closures I-10 to Airway Boulevard. Crews will be placing permanent striping along newly paved lanes. North Mesa Street Lighting Improvement Project Monday, Oct. 21 through Friday, Oct. 25 from 9 a.m. to 4 p.m. Mesa (SH-20) northbound and southbound alternating lane closures Glory Road / East Baltimore Drive to Mesita Drive/Sun Bowl Drive. If needed mobile lane closure – Mesa (SH-20) southbound alternating lane closures I-10 to Crossroads Drive. If needed mobile lane closure – Mesa (SH-20) northbound and southbound alternating lane closures Mesita Drive/Sun Bowl Drive to Sunland Park Drive. Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, installing new lighting poles, removing existing poles, electrical inspection, and Concrete sidewalk and landscape repairs. Traffic Signal Improvements Project Monday, Oct. 21 through Friday, Oct. 25 from 9 a.m. to 4 p.m. Dyer (BUS-54) north and southbound right lane closures at the Tetons Drive intersection. Dyer (BUS-54) north and southbound right lane closures at the Hondo Pass Drive intersection.. Zaragoza (FM 659) north and southbound right lane closures at Escobar Drive intersection. US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Martin Luther King Boulevard/Kenworthy Street intersection. If needed - US-54 Gateway North Boulevard and Gateway South Boulevard turn-around closures at Martin Luther King Boulevard/Kenworthy Street intersection. Saturday, Oct. 26 from 7 a.m. to 3:30 p.m. Dyer (BUS-54) north and southbound right lane closures at the Hondo Pass Drive intersection. US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Martin Luther King Boulevard/Kenworthy Street intersection. If Needed - US-54 Gateway North Boulevard and Gateway South Boulevard turn-around closures at Martin Luther King Boulevard/Kenworthy Street intersection. Crews will be working on intersection improvements. US-54 & State Line Project Monday, Oct. 21 through Friday, Oct. 25 from 7 a.m. to 4 p.m. US-54 south- and northbound from State Line Road reduced to one lane. Crews will be working demolition and preparation of the new turnaround of side shoulders. Paisano Bridge Replacement Monday, Oct. 21, 2024, through Tuesday, Sept. 16, 2025. Continuous closure: US-62 (Paisano) eastbound between Doniphan and Executive closed. Crews will be working on demolition and bridge work. Pedestrian Facilities Improvement Project Monday, Oct. 21 through Friday, Oct. 24 from 9 a.m. to 4 p.m. US-62 (Paisano) west- and eastbound between Boone and Val Verde right lane closed. Crews will be working on demolition of guardrails, concrete curb, gutter, sidewalks, and fencing. BU-54 (Dyer) west- and eastbound between Titanic and Hercules left lane closed. Crews will be working on drill shaft excavation. SL-478 (Dyer) west- and eastbound between Ellerthorpe and Julian right lane closed. Crews will be working on trenching for conduit installation. ITS INFRA at Zaragoza/BOTA Port of Entry Monday, Oct. 21 from 9 a.m. to 4 p.m. Loop 375 (Border Highway) eastbound before Zaragoza shoulder closure. US-54/Gateway North turnaround and right lane closed. Tuesday, Oct. 22. Paisano (US-62) eastbound after US-53/Gateway North right lane and right turn lane onto Gateway North to Paisano closed. Paisano (US-62) westbound left lane before Gateway North and right turn lane on Paisano to Gateway North closed. Thursday, Oct. 24. Loop 375 (Border Highway) westbound before Padres shoulder closure. Crews will be working on the installation of DMS’s. Guardrail Repair Monday, Oct. 21 from 9 a.m. to 4 p.m. Loop 375 (Border Highway) westbound between Zaragoza and Padres right lane closed. Tuesday, Oct. 22 from 9 a.m. to 4 p.m. I-10 eastbound between Santa Fe and Dallas right lane closed. Wednesday, Oct. 23 from 9 a.m. to 4 p.m. US-54 southbound connector ramp between Ellerthorpe and Spur 601 with a complete on-ramp closure at Ellerthorpe. Thursday, Oct. 24 from 9 a.m. to 4 p.m. I-10 eastbound between Sunland Park and Executive right lane closed. Friday, Oct. 25 from 9 a.m. to 4 p.m. Loop 375 (Transmountain) eastbound between Main Gap and US-54 left lane closed. Crews will be working on guardrail. Miscellaneous Concrete Sunday, Oct. 20 through Thursday, Oct. 24 from 9 p.m. to 4 a.m. (Nightly) I-10 eastbound between Copia and Paisano left lane closed. I-10 westbound between Airway and Paisano left lane closed. Crews will be repairing concrete barrier wall. Spall Repair Sunday, Oct. 20 through Thursday, Oct. 24 from 9 p.m. to 6 a.m. (Nightly) I-10 eastbound between Sunland overpass and Copia overpass alternate lane closures. Crews will be working on spall repairs. Maintenance Sunday, Oct. 20 from 5 a.m. to 5 p.m. Ramp K closed, US-54 southbound to I-10 closed. Complete freeway closure between Loop 375 (Border Hwy) and I-10, Exit 20 (Paisano). Trowbridge entrance ramp to US-54 southbound closed. Copia exit ramp closed. Boone Street closed. Crews will be working on bridge joints. Monday, Oct. 21, and Friday, Oct. 25 from 9 a.m. to 4 p.m. Loop 375 westbound at Padres exit and entrance closed. Crews will be performing mill and inlay. Loop 375 (Border West) east- and westbound between Spur 1966 and Executive alternate lane closures. Loop 375 (Border Highway) east- and westbound at Yarbrough overpass alternate lane closures. Crews will be sealing bridge joints. US-85 (Paisano) between Spur 1966 and Yandell right lane closed. Crews will be working on the drain. Montana Widening Project Monday, Oct. 14 to Saturday, Nov. 2. Daily, 9 a.m. to 5 p.m. Montana Avenue (US 62/180) westbound frontage road left lane closure from Saul Kleinfeld to Lee Boulevard. Crews will be exporting material. Tuesday, Oct. 22 to Thursday, Oct. 24. Nightly, 9 p.m. to 5 a.m. Montana Avenue (US 62/180) eastbound frontage road complete closure from Yarbrough Drive to Lee Boulevard. Crews will be working on CRCP at Saul Kleinfeld. Purple Heart 375 Widening Project Continuous closure until further notice: Purple Heart Highway north and southbound shoulder closures from Montana Avenue to Spur 601. Crews will be widening main lanes and constructing north and southbound frontage road. Loop 375 Widening Project Continuous closure, beginning Monday, Oct. 21 to Friday, Oct. 25. Americas Avenue (frontage road) southbound left lane and south to north turnaround UPRR Bridge underpass at North Loop Road. Americas Avenue (frontage road) northbound, north to south turnaround UPRR Bridge underpass at Alameda Avenue. Crews will be working on installation of curb/sidewalk, guardrail, and concrete barrier. SH 20 Alameda Mill and Inlay Project Sunday, Oct. 20 to Friday, Oct. 25. Nightly, 8 p.m. to 6 a.m. Alameda Avenue (SH-20) east- and westbound alternate lane closures between Padres Drive and Glenwood Court. Crews will be milling, paving, and installing pavement markings. Horizon (FM1281)/Darrington Reconstruction Project Monday, Oct. 21 to Friday, Oct. 25. Daily, 9 a.m. to 4 p.m. Darrington Road at Pawling Drive alternate lane closures. Crews will be installing temporary signals on existing traffic poles. Monday, Oct. 21 to Friday, Oct. 25. Continuous closure beginning at 5 p.m. Horizon Boulevard westbound right lane and shoulder closure from Desert Mesa Drive to Thea Smith Drive. Crews will be working on striping new pavement. Continuous closures: Monday, March 25 until further notice: Horizon Boulevard (FM1281) westbound lane closure from Torrey Pines to Desert Mesa Drive, lanes reduced to one lane. Horizon Boulevard (FM1281) hike/bike trail from Torrey Pines to Desert Mesa Drive will be closed indefinitely. Friday, June 28 until further notice: Horizon Boulevard (FM 1281) westbound lane from Desert Mesa to Rodman Street will be shifted to the median and transitioned back on Rodman Street. Horizon Boulevard (FM 1281) and Lago Del Esta intersection closure. Crews will be working on final subgrade, pavement operations and excavating ponding areas. Alameda Raised Medians Project Sunday, Oct. 20 to Friday, Oct. 25. Nightly, 9 p.m. to 6 a.m. and daily, 9 a.m. to 4 p.m. Alameda Avenue (SH-20) east- and westbound inside lane closures between Rio Vista Road and Passmore Road. Crews will be installing concrete medians and electrical items. Loop 375 Mill and Inlay Project Sunday, Oct. 20 to Thursday, Oct. 24. Nightly, 7:30 p.m. to 6 a.m. Joe Battle Boulevard (frontage road) north- and southbound alternating lane closures between Pellicano Drive and Montana Avenue. Traffic will be reduced to one lane in work areas. Crews will be pouring concrete sidewalks in the shoulders and striping at intersections controlled by Temporary Traffic Signals. ADA Improvements Project Monday, Oct. 21 until further notice. Daily, 9 a.m. to 5 p.m. Alameda Avenue (SH-20) east- and westbound alternating lane closures from Americas Highway (Loop 375) to Horizon Boulevard (FM 1281). Crews will be removing sidewalks and ramps for ADA improvements. I 10 Landscape & Aesthetics Project Friday, Oct. 18 to Friday, Oct. 25. Daily, 7 a.m. to 4 p.m. I-10 eastbound at Lee Trevino underpass right lane and shoulder closure. Gateway East Boulevard at Lee Trevino Drive left lane closed. I-10 westbound at Lee Trevino underpass right lane and shoulder closure. Crews will be removing concrete riprap. Closure Links: West Area Project Closures I-10 Widening West Closures East Area Project Closures 
Respond, make new discussions, see other discussions and customize your news...

To add this website to your home screen:

1. Tap tutorialsPoint

2. Select 'Add to Home screen' or 'Install app'.

3. Follow the on-scrren instructions.

Feedback
FAQ
Privacy Policy
Terms of Service