Sep 20, 2024
EL PASO, Texas (KTSM) - The Texas Department of Transportation (TxDOT) El Paso has released a list of road closures for the week of Sept. 20, that could affect your commute. I-10 Widening West Project Sunday, September 22, through Thursday, September 26 from 8 p.m. to 5 a.m. and Monday, September 23, through Saturday, September 28 from 9 a.m. to 4 p.m. I-10 East and West will be reduced to one lane between Vinton Road and Transmountain Road as needed. Crews will be working on retaining walls. Monday, September 23, through Saturday, September 28 from 9 a.m. to 4 p.m. Alternating lane closures on Redd Road between North Desert Boulevard and South Desert Boulevard. Right turn lane from South Desert Boulevard to Redd Road will be closed daily beginning on Wednesday, September 25. Crews will be conducting electrical work. Monday, September 23, through Saturday, September 28 from 9 a.m. to 4 p.m. I-10 East and West will be reduced to one lane between Mesa Street and Thorn Avenue. Crews will be working on drilled shafts and retaining walls. Paisano Rehabilitation Project (Mid-town) Sunday, September 22 through Friday, September 27 from 9 p.m. to 6 a.m. (Nightly) East Paisano/Montana (US-62) eastbound alternating lane closures I-10 to Airway Boulevard. Monday, September 23 through Friday, September 27 from 9 a.m. to 4 p.m. (Daily) East Paisano/Montana (US-62) eastbound alternating lane closures I-10 to Airway Boulevard. Crews will be milling and paving. Expect delays and intermittent cross-street and driveway closures during milling and paving activities. If possible, seek alternate routes. Please remember those residential/business access locations may be temporarily shifted due to milling/paving activities. North Mesa Street Lighting Improvement Project Monday, September 23 through Friday, September 27 from 9 a.m. to 4 p.m. If Needed Mobile Lane Closure – Mesa (SH-20) north- and/or southbound lane closures anywhere between Crossroads Drive to Glory Road/East Baltimore Drive. Crews will be finishing up activities. Traffic Signal Improvements Monday, September 23 through Friday, September 27 from 9 a.m. to 4 p.m. Dyer (BUS-54) north and southbound right lane closures at the Tetons Drive intersection. Dyer (BUS-54) north and southbound right lane closures at the Hondo Pass Drive intersection.. Zaragoza (FM 659) north and southbound right lane closures at Escobar Drive intersection. US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Sun Valley Drive intersection. US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Martin Luther King Boulevard/Kenworthy Street intersection. If Needed - US-54 Gateway North Boulevard and Gateway South Boulevard turn-around closures at Martin Luther King Boulevard/Kenworthy Street intersection. If Needed - US-54 Gateway North Boulevard and Gateway South Boulevard turn-around closures at Sun Valley Drive intersection. Crews will be working on intersection improvements. Monday, September 23 through Friday, September 27 from 9 a.m. to 4 p.m. Mesa east- and westbound at Belvidere intersection alternate lane closures. Crews will be potholing and boring to line locate. Monday, September 23 through Friday, September 27 from 7 a.m. to 7 p.m. Zaragoza and George Dieter intersection alternate lane closures. Alameda north- and southbound at Delta intersection alternate lane closures. Crews will be working on traffic signals. Paisano Bridge Replacement Monday, September 23, 2024, through Tuesday, September 16, 2025 Continuous closure US-62 (Paisano) eastbound between Doniphan and Executive closed. Crews will be working on demolition and bridge work. Pedestrian Facilities Improvement Project Monday, September 23 through Friday, September 27 from 9 a.m. to 4 p.m. US 62 (Paisano) west- and eastbound between Boone and Dolan right lane closed. Crews will be working on demolition of guardrails, concrete curb, gutter, sidewalks, and fencing. BU 54 (Dyer) west- and eastbound between Titanic and Hercules left lane closed. Crews will be working on median improvements. SL 478 (Dyer) west- and eastbound between Ellerthorpe and Julian right lane closed. Crews will be working on trenching for conduit installation. Monday, September 23 and Tuesday, September 27 from 9 p.m. to 6 a.m. (Nightly) US 62 (Paisano) west- and eastbound between Washington and Val Verde full closure. Crews will be work on demolition of pedestrian bridges. Monday, September 23 through Friday, September 27 from 9 p.m. to 6 a.m. (Nightly) BU 54 (Dyer) at Titanic median intersection closure. Crews will be working on median improvements. Sunday, September 22 through Saturday, September 28 Continuous closure BU 54 (Dyer) west- and eastbound between Gateway North at Hercules full closure. Crews will be working on median improvements. Guardrail Repair Monday, September 23 from 9 a.m. to 4 p.m. US-54 southbound between Ellerthorpe and Fred Wilson right lane closed. Tuesday, September 24 from 9 a.m. to 4 p.m. US-54 southbound between Ellerthorpe and Cassidy right lane closed. Wednesday, September 25 from 9 a.m. to 4 p.m. US-54 northbound at Cassidy off-ramp and left lane closed. Thursday, September 26 from 9 a.m. to 4 p.m. Loop 375 (Border West) westbound between Coles and Oregon right lane closed. Friday, September 27 from 9 a.m. to 4 p.m. I-10 eastbound between Resler and Buena Vista right lane closed. Crews will be repairing guardrail. Spall Repair Project Sunday, September 22 through Thursday, September 26 from 9 p.m. to 6 a.m. (Nightly) I-10 westbound between Porfirio Diaz and Sunland Park alternate lane closures. Crews will be working on spall repairs. Maintenance Monday, September 23 through Friday, September 27 from 9 a.m. to 3 p.m. Loop 375 (Transmountain) between Tom Mays Park and I-10 alternate lane closures. Crews will be working on shoulder. Wednesday, September 25 and Thursday, September 26 from 8 p.m. to 5:30 a.m. Artcraft (SH-178) east- and westbound between Doniphan and Upper Valley two right lanes closed. Crews will be performing a field evaluation of pavement. Montana Widening Project Monday, September 9 to Monday, September 30. Daily, 9 a.m. to 5 p.m. Montana Avenue (US 62/180) westbound frontage road alternating lane closures from Loop 375 to Global Reach. Crews will be working on landscape. Monday, September 23 to Friday, September 27 from 9 a.m. to 5 p.m. Montana Avenue (US 62/180) eastbound frontage road left lane closure from East Glen Drive to Alba Lane. Crews will be working on concrete railing. Purple Heart 375 Widening Project Friday, September 13 to Friday, September 27. Daily, 9 a.m. to 4:30 p.m. Purple Heart Highway (SL 375) northbound left lane closure from Montana Avenue to Iron Medics Drive. Crews will be paving in median. Loop 375 Widening Project Monday, September 23 to Friday, September 27. Daily, 9 a.m. to 4 p.m. Joe Battle Boulevard (frontage road) northbound left lane closure between Pine Springs Drive and Paseo Del Este Boulevard. Americas Avenue (frontage road) northbound alternating lane closures between South Americas Avenue (Truck Port of Entry) and Joe Rodriguez Drive. Crews will be installing guard rails and underground conduit. Continuous closure, beginning Monday, September 23 to Friday, September 27. Americas Ave. (frontage road) southbound left lane between Pan American Drive and South Americas Avenue underpass (truck port of entry). Americas Avenue (frontage road) southbound left lane and south to north turnaround UPRR Bridge underpass at North Loop Road. Americas Avenue (frontage road) northbound, north to south turnaround UPRR Bridge underpass at Alameda Avenue. Crews will be working on installation of asphalt, curb/sidewalk, and concrete barrier. Alameda Mill and Inlay Project Sunday, September 22 to Thursday, September 26. Nightly, 8 p.m. to 6 a.m. Alameda Avenue (SH-20) east- and westbound alternate lane closures between Presa Place and Yarbrough Drive. Crews will be milling and paving. I-10 Landscape & Aesthetics Project Monday, September 23 to Friday, September 27. Daily, 9 a.m. to 4:00 p.m. I-10 eastbound at Lee Trevino underpass right shoulder closure. Crews will be removing concrete riprap. Horizon (FM1281)/Darrington Reconstruction Project Continuous closures Monday, March 25 until further notice Horizon Boulevard (FM1281) westbound lane closure from Torrey Pines to Desert Mesa Drive, lanes reduced to one lane. Horizon Boulevard (FM1281) hike/bike trail from Torrey Pines to Desert Mesa Drive will be closed indefinitely. Friday, June 28 until further notice Horizon Boulevard (FM 1281) westbound lane from Desert Mesa to Rodman Street will be shifted to the median and transitioned back on Rodman Street. Horizon Boulevard (FM 1281) and Lago Del Esta intersection closure. Crews will be working on final subgrade, pavement operations and excavating ponding areas. Alameda Raised Medians Project Sunday, September 22 to Thursday, September 26. Nightly, 9 p.m. to 6 a.m. Alameda Avenue (SH-20) east- and westbound inside lane closures between Rio Vista Road and Passmore Road. Crews will be installing concrete medians and electrical items. Loop 375 Mill and Inlay Project Sunday, September 22 to Thursday, September 26. Nightly, 7:30 p.m. to 6 a.m. Joe Battle Boulevard (frontage road) north- and southbound alternating lane closures between Pellicano Drive and Montana Avenue. Crews will be pouring concrete sidewalks and performing cleaning operations. Districtwide Metal Beam Guard Fence Monday, September 16 through Friday, September 30. Daily, 6:30 a.m. to 8:30 p.m. I-10 east- and westbound alternating shoulder and lane closures between Horizon Boulevard and Fabens exit. Crews will be working on metal beam guard fence. Closure Links: West Area Project Closures I-10 Widening West Closures East Area Project Closures 
Respond, make new discussions, see other discussions and customize your news...

To add this website to your home screen:

1. Tap tutorialsPoint

2. Select 'Add to Home screen' or 'Install app'.

3. Follow the on-scrren instructions.

Feedback
FAQ
Privacy Policy
Terms of Service