Nov 22, 2024
EL PASO, Texas (KTSM) — The Texas Department of Transportation (TxDOT) El Paso has released a list of road closures for the week of Nov. 22, that could affect your commute. I-10 Widening West Saturday, Nov. 23 from 3 a.m. to 4 p.m. I-10 East will be closed at Redd Road. Take Exit 8 (Redd Road), continue on South Desert Boulevard, and re-enter I-10 past Mesa Street. Crews will be placing the bridge deck. 18 HOUR CLOSURE Saturday, Nov. 23 from 3 a.m. to 9 p.m. Full closure on I-10 West from Vinton to Anthony, TX. DETOUR: Exit at Westway Boulevard to North Desert, through the Vinton and Anthony Intersections and enter I-10 Westbound after Anthony, TX.  Crews will be installing new concrete barriers and pavement striping. Diamond Grinding (IH-10 & US-54) Saturday, Nov. 23 from 7 a.m. to 4 p.m. US-54 southbound between Pershing and Montana all lanes closed. Sunday, Nov. 24 from 6 p.m. to 6 a.m. US-54 southbound between Pershing and Montana all lanes closed. Guardrail Repair Project Monday, Nov. 25 through Wednesday, Nov. 27 from 9 a.m. to 4 p.m. Dyer southbound between Hercules and Gateway South alternate lane closures. Monday, Dec. 2 from 9 a.m. to 4 p.m. I-10 westbound at Cotton exit complete closure. Tuesday, Dec. 3 from 9 a.m. to 4 p.m. I-10 eastbound connector ramp to US-54 northbound left lane closed. Wednesday, Dec. 4 from 9 a.m. to 4 p.m. Loop 375 westbound between Tom Mays Park to Paseo del Norte left lane closed. Spall Repair Project Sunday, Dec. 1 through Thursday, Dec. 5 from 9 p.m. to 5 a.m. (Nightly) I-10 westbound between Copia and Porfirio Diaz alternate lane closures. Crews will be working on spall repairs. Maintenance Monday, Dec. 2 through Friday, Dec. 6 from 9 a.m. to 4 p.m. SH-178 (Artcraft) east and westbound between Doniphan and Upper Valley alternate lane closures. Crews will be sealing bridge joints. Montana Widening Project Monday, Dec. 2 from 9 a.m. to 5 p.m. Montana Avenue (US 62/180) eastbound full main lane closure at Walmart driveway entrance. Crews will be working on the driveway. Monday, Dec. 2 to Friday, Dec. 6 from 9 p.m. to 5 a.m. (Nightly) Montana Avenue (US 62/180) eastbound full main lane closure from Joe Battle Boulevard to Tierra Este Drive. Crews will be working on the eastbound frontage road.Monday, Nov. 25 to Friday, Dec. 6 from 9 a.m. to 5 p.m. (Daily) Montana Avenue (US 62/180) eastbound frontage road right turn lane closed at Saul Kleinfeld Drive. Saul Kleinfeld Drive northbound right lane closure at Montana Avenue. Crews will be boring. Purple Heart Widening Project Continuous closure Starting at 3 a.m. Saturday, Nov. 23 through 5 a.m. Monday, Nov. 25 Purple Heart Highway (Loop 375) north and southbound full closure between Montana Avenue and Spur 601. Purple Heart Highway (Loop 375) northbound on-ramp at Montana Avenue will be closed. Purple Heart Highway (Loop 375) southbound on-ramp at Spur 601 will be closed. Crews will be pouring concrete for a bridge deck. Monday, Nov. 25 to Wednesday, Nov. 27 from 8 a.m. to 4:30 p.m. (Daily) Purple Heart Highway (Loop 375) north and southbound left lane closures between Montana Avenue and Iron Medics Drive. Crews will need closures to allow asphalt trucks to exit safely. Continuous closure until further notice Purple Heart Highway north and southbound shoulder closures from Montana Avenue to Spur 601. Crews will be widening main lanes and constructing north and southbound frontage road. Loop 375 Widening Project Monday, Nov. 25 to Tuesday, Nov. 26 from 9 a.m. to 4 p.m. (Daily) Americas Avenue (frontage road) north and southbound left lane closure and shoulder work at median between North Loop Drive and I-10. Crews will be installing conduit and pulling electrical wire for Digital Message Signs. Continuous closure Starting on Monday, Nov. 25 to Friday, Dec. 6 Americas Avenue (frontage road) southbound left lane and south to north turnaround UPRR Bridge underpass at North Loop Drive right lane only. Americas Avenue (frontage road) northbound, north to south turnaround UPRR Bridge underpass at Alameda Avenue. Crews will be working on installation of curb/sidewalk, guardrail, T-551 concrete barrier, and bridge structures. Alameda Mill and Inlay Project Sunday, Nov. 24 to Tuesday, Nov. 26 from 8 p.m. to 6 a.m. (Nightly) Alameda Avenue (SH-20) east and westbound alternate lane closures between Padres Drive and Glenwood Street. Crews will be installing pavement markings, curb/gutter, sidewalks and working on adjusting manholes. Sunday, Dec. 1 to Thursday, Dec. 5 from 8 p.m. to 6 a.m. (Nightly) Alameda Avenue (SH-20) east and westbound alternate lane closures between Padres Drive and Glenwood Street. Crews will be installing pavement markings, curb/gutter, sidewalks and working on adjusting manholes. Horizon/Darrington Reconstruction Project Monday, Nov. 25 to Wednesday, Nov. 27 from 9 a.m. to 4 p.m. (Daily) Horizon Boulevard (FM1281) westbound intermittent right lane closures from Desert Mesa Drive to Thea Smith Drive. Horizon Boulevard (FM1281) eastbound intermittent right lane closure at Thea Smith. Crews will be installing new roadway illumination. Continuous closures Monday, March 25 until further notice: Horizon Boulevard (FM1281) westbound lane closure from Torrey Pines to Desert Mesa Drive, lanes reduced to one lane. Horizon Boulevard (FM1281) hike/bike trail from Torrey Pines to Desert Mesa Drive will be closed indefinitely. Friday, June 28 until further notice: Horizon Boulevard (FM 1281) westbound lane from Desert Mesa to Rodman Street will be shifted to the median and transitioned back on Rodman Street. Horizon Boulevard (FM 1281) and Lago Del Esta intersection closure. Crews will be working on final subgrade, pavement operations and excavating ponding areas. Loop 375 Mill and Inlay Project Sunday, Nov. 24 to Tuesday, Nov. 26 from 7:30 p.m. to 6 a.m. (Nightly) Joe Battle Boulevard (frontage road) north and southbound right lane closure between Pellicano Drive and Montana Avenue. Crews will be pouring concrete sidewalks. Monday, Nov. 25 to Wednesday, Nov. 27 from 9 a.m. to 4 p.m. (Daily) Joe Battle Boulevard (frontage road) north and southbound alternate lane closures between Pellicano Drive and Montana Avenue. Crews will be pouring concrete sidewalks and striping shoulders with traffic being controlled by temporary traffic signals. Sunday, Dec. 1 to Thursday, Dec. 5 from 7:30 p.m. to 6 a.m. (Nightly) Joe Battle Boulevard (frontage road) north and southbound alternating lane closures between Pellicano Drive and Montana Avenue. Traffic will be reduced to one lane in work areas. Crews will be pouring concrete sidewalks and striping main lanes, bike lane, and shoulders with traffic being controlled by temporary traffic signals. Monday, Dec. 2 to Friday, Dec. 6 from 9 a.m. to 4 p.m. (Daily) Joe Battle Boulevard (frontage road) north and southbound alternating lane closures between Pellicano Drive and Montana Avenue. Crews will be pouring concrete sidewalks and striping main lanes, bike lane, and shoulders with traffic being controlled by temporary traffic signals. I-10 Landscape & Aesthetics Project Monday, Nov. 25 to Wednesday, Nov. 27 from 7 a.m. to 3:30 p.m. (Daily) I-10 eastbound at Lee Trevino underpass right lane and shoulder closure. Gateway East Boulevard at Lee Trevino Drive left lane closed. Crews will be removing concrete riprap. Monday, Nov. 25 to Wednesday, Nov. 27 from 9 a.m. to 4 p.m. (Daily) I-10 westbound at Lee Trevino underpass right lane and shoulder closure. Crews will be removing concrete riprap. Monday, Dec. 2 to Friday, Dec. 6 from 7 a.m. to 3:30 p.m. (Daily) I-10 eastbound at Lee Trevino underpass right lane and shoulder closure. Gateway East Boulevard at Lee Trevino Drive left lane closed. Crews will be removing concrete riprap. Monday, Dec. 2 to Friday, Dec. 6 from 9 a.m. to 4 p.m. (Daily) I-10 westbound at Lee Trevino underpass right lane and shoulder closure. Crews will be removing concrete riprap. Closure Links: West Area Project Closures I-10 Widening West Closures East Area Project Closures 
Respond, make new discussions, see other discussions and customize your news...

To add this website to your home screen:

1. Tap tutorialsPoint

2. Select 'Add to Home screen' or 'Install app'.

3. Follow the on-scrren instructions.

Feedback
FAQ
Privacy Policy
Terms of Service